Calendar

The graph below summarises the collection schedule for the seven surveys planned as part of LifeObs.

Each survey is produced according to its own timetable, within a framework decided at European level as part of ERFI2, GUIDE and SHARE.

At this stage of the project :

  • the ENVIE survey has been finalised
  • collection of the first waves of ERFI2 and FAMEMP has been completed
  • wave 10 of SHARE data collection began at the end of 2024 and will continue into 2025
  • collection of the Family survey is scheduled for 2025, after a pilot in 2024