Calendar
The graph below summarises the collection schedule for the seven surveys planned as part of LifeObs.
Each survey is produced according to its own timetable, within a framework decided at European level as part of ERFI2, GUIDE and SHARE.
At this stage of the project :
- the ENVIE survey has been finalised
- collection of the first waves of ERFI2 and FAMEMP has been completed
- wave 10 of SHARE data collection began at the end of 2024 and will continue into 2025
- collection of the Family survey is scheduled for 2025, after a pilot in 2024